GTEC USA/Japan
Owner/Consultant | 04/2020 - Current
Set up Business unit in the United States and Japan operating in coastal ports.
? Set up VDC processes including survey model alignment
? PC Set Up services for Large Data sets.
? Advanced Microsoft Sharepoint services for access and sites
? 3D Laser Scan Services including aligning to customers' models
?Photographed projects
?flew drones for imagery and video
Knock Knock Japan
Photographer, Blogger | 01/2004 - Current
1. Photograph, edit and publish content on www.knockknockjapan.com
2. Measure and track the effectiveness of blog topics based on number of viewers and number of comments.
3. Perform continuous enhancements and modifications to the blog.
4. Troubleshoot and repair bugs and technical problems
5. As appropriate, respond promptly to blog comments and e-mail.
DPR
Senior Reality Capture Engineer | 02/2019 - 04/2020
? Laser Scan Tech specializing in Leica Geosystems Products
? In House Leica Trainer for DPR
? Laser Scanned and Managed BIM Process on $135M Pursuit of the PHX Mayo Clinic
? Worked in nearly every US Based office on Scan Projects
Datum Tech Solutions
Reality Capture Manager | 05/2017 - 02/2019
? Leica Sales, Services and Training
? Averaged two RTC360 Monthly for two years.
? Set up VDC processes including survey model alignment
? Managed Computer purchasing for company.
University of Southern California
Project Engineer | 11/2013 - 05/2017
? Managed everything related to BIM, VDC, Project Files, documents, and processes.
? Created Bluebeam Dashboard for use by Internal team, General Contractor, Subcontractors, and Consultants. The USC Village Bluebeam Project is currently the largest ever created at 60 Gigs.
? Managed internal communication between departments within USC related to the project.
? Project Manager for ATSAC replacement.
Mike Rovner Construction, Inc
Senior Project Engineer | 02/2013 - 04/2014
This project consists of converting an AMC 16 into 69 units of loft style apartments, single and two story. The AMC is situated in a mixed use complex in Downtown Long Beach. The theater is sandwiched between 3 floors of parking below and 3 floors of apartments above equaling 226 units in capacity. The structure for the AMC was originally design built as a movie theater with structural metal, metal pan decking and 6” of concrete. The structure itself was a challenge due to the sloping floors, elevation changes and low ceiling heights. My job consists of Maintaining meeting minutes, writing/logging RFI’s, writing/logging change orders, writing/logging submittals, writing/maintaining schedule, specification conformance, construction planning, redlining and planning/permitting.
Abilene Inc
Project Manager | 04/2012 - 02/2013
Plan, direct, coordinate, budget, and implement boiler installations.
Urban Homesteading Assistance Board
Project Manager- Construction | 05/2009 - 04/2012
Plan, direct, coordinate, and budget projects, manage subordinate supervisory personnel, activities concerned with the construction and maintenance of structures, facilities, and weatherization systems. Participate in the conceptual development of a construction projects and oversee its organization, budgeting, scheduling, engineering specifications and drawing through implementation.
Hanac Weatherization
Multi Family Construction Manager | 05/2008 - 05/2009
Multiple Jobsites in Astoria/Queens
PROJECT TYPE: Construction/ Weatherization
Dollar Value: $10,000- $500,000
Brief Description of Project: Plan, direct, coordinate, and budget projects, manager subordinate supervisory personnel, activities concerned with the construction and maintenance of structures, facilities, and weatherization systems. Participate in the conceptual development of a construction weatherization projects and oversee its organization, scheduling, and implementation.
Garco Building Systems
Systems Engineer-CQC Assistant | 03/2006 - 05/2008
98315
PROJECT TYPE: Construction
Dollar Value: $19,000,000.00
Brief Description of Project: The project consists of constructing a; The building is constructed of Steel and CMU exterior walls with an overlay of CMU Veneer and Metal Wall Panels. There are 18,000 sq feet of assembly area and 16,000 sq feet of shop and office area all covered by a membrane barrel roof. The project has stringent facilities evaluation and testing requirements with strict compliance to codes, LEED guidelines and contract specifications. Job responsibilities include: reviewing all materials submittals for compliance and submitting them to the Navy, tracking submittal register and the requests for information, making weekly storm water inspection and keeping the SWPPP updated, field inspections to insure work is in contract compliance, implements the three phase quality control program, and conducts the weekly QC meetings.
McClure and Sons
Project Engineer | 02/2006 - 03/2007
PROJECT TYPE: Construction
Dollar Value: $28,000,000
Brief Description of Project: The project consists of retrofitting the existing Waste Water Treatment Plant and adding a Bioreactor to boost capacity of the plant to 1,000,000 gallons of water cleaned per day. The City of Winlock has expanded its capacity by adding eight Membrane Bioreactor Cells on the upper hill above the existing plant. The new Reactor is construction of Concrete with CMU Pump house and stands 40' above grade and has a footprint of nearly 12,000 sq feet. There is also a new Generator and tool storage shed on the new upper facility. The lower facility consists of retrofitting the existing equipment and office area's to the new facility. Job responsibilities include: reviewing all materials submittals for compliance and submitting to the Architect, tracking submittal register, procurement log and the requests for information. Assisted with all Safety and acted as the alternate Superintendent.
Employing Firm: CityWide Electric
General Superintendent | 02/2004 - 03/2006
Managed day to day operations for the greater San Diego area. Walked jobs for specification conformance and attending job sites meetings. Red-lined drawings for fire alarm systems, sprinkler monitoring systems, a variety of security systems for home and business, vacuum systems, television, data and phone pre wiring, surround sound & intercom systems, nurse call systems & closed circuit systems. Job-sites varied in size from as small as a single family residence to shopping malls, high rise apartments and office buildings.
McGuire Electric
Project Manager | 01/2001 - 01/2004
Assorted Jobsites
PROJECT TYPE: Construction
Dollar Value: Range from $60,000- $5,000,000
Brief Description of Project: New Construction projects consisting of high rise commercial mixed use fire alarm, security and telephone systems. Duties included; managing man power needs of jobsites, randomly selecting jobsites for conformance to contract inspections, scheduling, budgeting, ordering materials, personnel training, and attending coordination meetings.